CIC return to operation Post Covid

CIC have returned to operation after a period of shutdown due to the coronavirus. New procedures are in place for staff and visitors, to ensure everyone’s safety. This week we have been able to perform decelerator sled tests, with the intention to increase the range of tests over the next few weeks. This limited range will be operating at a reduced efficiency, as we maintain social distancing. We will only re-introduce tests, when it is safe to do so. Please still get in touch to discuss any future testing requirements and we can plan a future test schedule. Thank you for your patience.

By |2020-07-29T13:59:28+00:00July 29th, 2020|